November 2022 News
Hello Aflora Community! We are excited to enter another holiday high-season in Tulum as both tourism and local occupancy rates begin to rise. While much of the world is preparing for a cold winter, we are enjoying perfect conditions as beaches and seas are clear and calm. The final units of Phase 1 are moving quickly with end-of-the-year discounts in effect. Aflora investors are now able to receive up to 4% additional discounts on the purchase of additional units.
Onsite, we are rapidly advancing to make-up for time lost to material and labor shortages. Thankfully we are beginning to receive our orders of delayed materials and equipment as global supply chains begin to recover. With all phases currently in progress, we are able to exert power in numbers on key areas that are first in line to be completed.
From unique handcrafted tile to bespoke cabinetry, we begin to see Aflora’s living spaces come to life as they receive their final finishes. Our design teams work day and night testing materials and ambience in all lighting conditions. Undeterred by minor delays, we are proud to see the vision of a unique community based around nature and art become a reality.
Construction Progress
Work continues on all key areas of Aflora. We summarize the major works ongoing in each area below
Loft Village:
Construction progress - 88% Complete
Installation of condenser units for air conditioners
Acrylic treatment of rooftop areas
Bases for railings and shading on private terraces
Tile installation in showers
Sheetrock ceilings painted
Installation of Kitchen cabinets
Installation of Closets
Elevator mounted and installed
Exterior lighting (testing underway)
Concrete base of reflecting pool constructed
Villa 1:
Construction progress - 84% Complete
Garden walls underway
Final interior finishes
Air conditioning equipment installed
Steel supports for doors and gates installed
Magic Apartment Towers
Tower C:
Construction progress - 50% Complete
Stairway between 3rd and 4th levels completed
3rd level floors poured
4th level structural elements underway
Ongoing masonry on final levels
Installations on lower levels
Tower D:
Construction progress - 22% Complete
2nd level floors poured
1st level installations in progress
Structural preparations for upper levels
Tower I:
Construction progress - 17% Complete
1st level walls underway
Structural preparations for upper levels
Tower A:
Construction progress - 74% Complete
External treatments for final finishes underway
Internal treatments for final finishes underway
Site cleaning and testing of installations
Filling and leveling of material in garden and pool areas.
Installations of Roof Gardens
Rehabilitation of Green Areas in surrounding vicinity
Tower B:
Construction progress - 76% Complete
External treatments for final finishes underway
Internal treatments for final finishes underway
Site cleaning and testing of installations
Installations of Roof Gardens
Installation of Rooftop Pergolas
Filling and leveling of material in garden and pool areas.
Service Areas & Bodegas:
Construction progress - 40% Complete
Walls and structural elements completed
Support structure for roof in progress
Installations of electrical and hydro sanitary in progress
Semi-Olympic Pool:
Construction progress - Awaiting final finish
All preliminary works completed and tested
Awaiting the termination of construction to apply final EKOL finish to prevent accidental damage or wear.
Natural Pool:
Construction progress - Awaiting final installations
Extended depth (up to 6 meters deep)
Natural circulation system to decrease maintenance costs
In-person direction of excavations from local experts in natural pools
BathHouse & Spa
Construction progress - Undergoing Modifications
Modification of construction technique in response to soil conditions and surrounding water levelService Areas & Bodegas:
Construction progress - 40% CompleteWalls and structural elements completed
Support structure for roof in progress
Installations of electrical and hydro sanitary in progress
Lobby:
Construction progress - 90% Complete
Final cement finish on stairs and
Sunset tower floor
Preparations for dynamic art installation
Panza (Restaurant):
Construction progress - 78% Complete
Non-slip tile flooring installed in Kitchen areas
Glass domes on dining area pergola installed
Installation of bar and open kitchen area
Wellness Tower:
Construction progress - 58% Complete
2nd level access stairs in progress
2nd level structure in progress
Rehabilitation of Green Areas in surrounding vicinity
Frontal Sculptural Wall:
Construction progress - 65% Complete
Created from solid concrete poured into hand-built forms
Section 1 complete
Section 2 in progress
Green Initiative
This November Aflora is getting greener than ever as we begin to landscape the integrated gardens in residential areas and amenities. With integrated drainage and drip systems, Aflora’s living spaces will be carefully adorned with native vegetation suitable for their unique location.
These organic installations will not only create a vibrant and lush atmosphere, but will also provide shade and privacy to residential areas. We will soon conclude testing on all garden installations and advance to the integration of local species.
Community News
This month Tulum received a visit from Mexican President Andrés Manuel López Obrador to personally announce details on upcoming projects and initiatives including the Maya Train and Tulum International Airport, both of which are currently undergoing important environmental impact surveys. The announcement concluded with news that within weeks we will be receiving official inauguration dates of these major initiatives.
As local businesses prepare for the impending high season, we have seen significant advances in public works projects including the improvement of key roads and the integration of stoplights and crosswalks in busy intersections. Return visitors will be pleased to find a safer, cleaner Tulum as we move closer to our vision of a sustainable future.